R0Li84
2016-07-15 13:44:30
- #1
I applied for my internet/telephone connection with Telekom. In the meantime, however, the telephone cable has already been laid into the house by the energy provider (small regional company).
The cable only needs to be connected to Telekom's cable and the "APL box" inside needs to be connected. No more earthworks are required. (I wanted to do all of these at once, which succeeded).
I have now read that Telekom is not allowed to charge for the connection in this case – can anyone happen to provide me with more information?
The cable only needs to be connected to Telekom's cable and the "APL box" inside needs to be connected. No more earthworks are required. (I wanted to do all of these at once, which succeeded).
I have now read that Telekom is not allowed to charge for the connection in this case – can anyone happen to provide me with more information?