And he probably planned a mess.
 

kettjen

2025-04-10 22:49:55
  • #2
The condensation problem is due to an incorrectly chosen insulation material (the EEE himself said this), otherwise everything is correct and well constructed. And I would have seen the insulation material in the competency area of the EEE, not detailed with the architect.

But then I'll approach him again.
 

kettjen

2025-04-11 21:39:08
  • #3
We have now spoken with the architect, he thinks it is a solution for us that will also be cost-neutral (I am curious) and will get back to us on Monday.
Still, again about the energy consultant.
Does he really not have to provide any evidence at all? He has to confirm quite a bit with the [TPN], right? How does he do that? Only based on the invoices from the trades?
 

HuppelHuppel

2025-04-15 17:31:18
  • #4
I am EEE and no, he does not have to provide proof. He has to confirm eligibility for funding, and this can usually be done based on the quotes or billing.
 

kettjen

2025-04-15 18:15:12
  • #5
How do you then bypass the ventilation concept for the customer? It is required according to the guideline for the building envelope.
 

Similar topics
23.10.2008We need an architect - or should I do it myself?14
02.01.2009Experiences with architects15
19.03.2013Turnkey or build with architects?19
21.07.2013Cost estimates from two architects differ greatly!10
13.11.2013Do you absolutely need an architect?10
16.12.2013Pre-planning with the architect - is having your own floor plan sensible?18
30.01.2014Architect's cost estimation15
21.08.2014Construction costs when building with architects. What does your experience say?18
11.02.2015Cost planning for a single-family house including land, additional costs, architect32
19.12.2014Finding architects - but how?26
08.09.2015Massive house by the architect, approximate costs?16
23.09.2015Responsibilities of the Architect in Tendering18
29.10.2015Is it normal for the purchase of land to be tied to an architect?16
19.01.2016Construction project with architects31
20.08.2016Should the house be planned by a general contractor or architects?30
10.03.2017Payment of the architect16
12.10.2017Cost of enclosed space. First draft discussed with architects27
27.10.2017Construction description by architects: Who has experience?13
11.12.2022Drywall gaps without insulation? What is the sound insulation value?10
11.01.2019Styrodur - the ideal insulation material for everything?10

Oben