Chris1234567
2020-05-26 18:54:28
- #1
Hello everyone,
I removed the rusted metal stop rail in the old building. Meanwhile, a rolling gate has been installed, so the rail is actually no longer needed. However, I drive over the step with the car. Is it sufficient in the long term to fill an old wedge (see picture gap) exclusively with concrete, or will it crumble? Who has experience? The metal rail or L-profile measuring 7cm x 3cm might rust again or become loose? What is the best solution?
Regards, Chris




I removed the rusted metal stop rail in the old building. Meanwhile, a rolling gate has been installed, so the rail is actually no longer needed. However, I drive over the step with the car. Is it sufficient in the long term to fill an old wedge (see picture gap) exclusively with concrete, or will it crumble? Who has experience? The metal rail or L-profile measuring 7cm x 3cm might rust again or become loose? What is the best solution?
Regards, Chris