MMarcWen 2016-06-20 21:25:04#1That cannot be correct, we are building a larger corner and have a primary energy demand QP of 23.4 kW/h.
That cannot be correct, we are building a larger corner and have a primary energy demand QP of 23.4 kW/h.
SSaruss 2016-06-20 21:42:23#2That can't be right, we are building a corner bigger and have a primary energy demand QP of 23.4 kW/h. but per sqm, the size is already factored out there?
That can't be right, we are building a corner bigger and have a primary energy demand QP of 23.4 kW/h. but per sqm, the size is already factored out there?
MMarcWen 2016-06-20 21:54:32#3Our 1st version was also faulty, I inquired again, it was then changed. [*]Heated building volume 1386.8 sqm [*]Heat-transferring envelope area 745 sqm [*]Usable building area 443.8 sqm
Our 1st version was also faulty, I inquired again, it was then changed. [*]Heated building volume 1386.8 sqm [*]Heat-transferring envelope area 745 sqm [*]Usable building area 443.8 sqm
MMarcWen 2016-06-20 22:19:51#523.4 kWh/m²a (?) - he has 31.6 kWh/m²a, that’s not so far off.. Well, we are building about 50% larger and have about 25% less primary energy demand QP. So I would at least follow up on that.
23.4 kWh/m²a (?) - he has 31.6 kWh/m²a, that’s not so far off.. Well, we are building about 50% larger and have about 25% less primary energy demand QP. So I would at least follow up on that.