11ant
2018-03-22 14:56:52
- #1
Is that calculated only in the loaded state? - then I would check whether it is possible to add a last step behind the last step; i.e., to attach another step that builds up on the raw floor - screed and underfloor heating would then have to start one step later. If that is not possible, the cause must first be clarified more precisely before a solution can be developed. Hopefully, you have a completion guarantee, so that the builder doesn't go bankrupt over roof and stairs being removed :-(Thus, for the first 15 steps I have a height of about 17 cm, and the very top last step has a height of about 29 cm.