We are building a KfW40 house, the design of the heating system was done according to "we have always done it this way." However, I cannot equip such an insulated house with a heating system that, for example, is used in a KfW70 or "normally" insulated house. And we know this because everything was listed in detail in the contract, specifying what was installed differently and also more cheaply.
 

RotorMotor

2024-04-02 19:41:41
  • #2
Unpack some details. What is guaranteed in the contract and what have you received now.
 

Bibakem

2024-04-02 19:56:11
  • #3
For example
Your Bosch air/water heat pump package
consisting of:
• BOSCH Monoblock outdoor unit AW 7 OR-S, series CS5800/6800i AW, 800x1100x550
• BOSCH air/water heat pump Compress, CS6800AW 12 wall-mounted indoor unit

etc.
It has now become smaller, which is cheaper
 

NatureSys

2024-04-02 21:07:55
  • #4
What does the developer say about the situation? After all, they are the contracting party.
 

Bibakem

2024-04-02 21:10:31
  • #5
He wants to shift that onto the heating engineer…
 

NatureSys

2024-04-02 22:48:36
  • #6

Well, there is probably no contract between the heating engineer and you. Therefore, it is goodwill if the heating engineer pays you something.
Whether you have a claim against the developer depends on your contract. Since you wanted the simplified heating system, it is not necessarily the case that the reduced costs fall on you. Typically, that is then additional profit for the developer.
 

Similar topics
16.06.2011Conclude a construction contract under reservation?10
13.09.2012Feeling pressured into a contract, is that normal?17
29.09.2011Is construction pre-planning without signature / contract legally valid?12
16.05.2015Contract unclear: humus earth collectors10
13.06.2015New construction with developer / construction drawing documents23
04.07.2016Building without a contract - Concerns?39
10.09.2016Construction financing and contract with the developer24
06.09.2014Siemens or Bosch dishwasher combined with Behälping rail14
24.10.2016Ikea Metod + BEHJÄLPLIG + Bosch Grundstück = Problem22
31.10.2015Install Bosch SMV68M90EU dishwasher in Ikea Metod23
21.09.2016Questions about Bosch SMV GSP in Ikea Metod kitchen unit11
30.01.2017Ikea Metod cabinet for built-in Bosch refrigerator HND22K20011
28.05.2017Plundering the Riester contract - for less need for credit?16
16.08.2018Civil engineering works without a contract - normal, experiences?10
30.08.2019Must developers indicate immense embankment height/costs?12
06.06.2019Completion date in General Contractor Agreement - Wording assistance62
13.07.2020Developer does not want to offset lump-sum damages with installments19
12.07.2021Simple Smart Home System - HomeKit: Bosch, Opus or others?12
31.03.2021Bosch Gll 2-10 - Cross line laser green or red?20
09.05.2021Price adjustment clause in the contract with the general contractor18

Oben