Opinion on the floor plan / Two points that need improvement

  • Erstellt am 2014-09-15 18:53:10

buddy2014

2014-09-16 09:43:08
  • #1
Yes, that's right, regarding the area of the corridors, this is a drawing from a developer that has already been changed 4 times. I will therefore bother the developer again, since it is not yet decided with whom I will build and this developer may be doing the work for nothing, I always feel guilty about it.
 

ypg

2014-09-16 12:01:13
  • #2
How should the ownership be divided? If only you build a house with a separate apartment, of course you have all the planning authority, otherwise your nephew should also be allowed to plan as a co-owner. Upstairs, I would shorten the end of the hallway and add the square meters to the kitchen and the bedroom. Two bathrooms should be enough for both residential units. A hallway is definitely too much on the ground floor. Make one entrance for both (that is the compromise), a hallway from which the stairs and the entrance to the ground floor apartment lead.
 

buddy2014

2014-09-16 12:33:56
  • #3
Thank you for the comment, yes I am still working on it. The house belongs to me alone but of course I also want to rent a nice apartment to my nephew. However, I discuss all the details with him so that he might possibly buy the house later.
 

lastdrop

2014-09-16 13:04:05
  • #4
Are you building the house for yourself or for him?
 

buddy2014

2014-09-16 13:44:26
  • #5
Actually for both of us. Now we (my husband and I) live in a smaller town, but I would like to move to Hamburg and since our children do not live in Germany, I would like to have someone from the family in the house later when we are older.
 

toxicmolotof

2014-09-16 14:02:32
  • #6
Just so you know: How much is the house (and property) supposed to cost? (and is the possibly necessary financing already arranged?)

How old are you that you are building with the grandchild?
 

Similar topics
06.02.2013Developer says: No more insulation!12
23.03.2011Developer or architect?15
26.09.2011Finding tiles from other manufacturers / sample selection for builders13
09.07.2012Developer offer for single-family house - Are the construction costs acceptable?16
16.07.2012The builder "outsources" fixed-price services to subcontractors12
03.08.2012Contract Supplement to the Construction Contract by the Developer36
30.09.2012Developer - Is withdrawal from the purchase contract possible?11
01.12.2014Real estate transfer tax / what is the tax applied to? Which developer MUST?30
18.02.2014Massive problems with the builder - is contract termination possible?33
23.06.2014Developer charges heavily for replanning - justified?12
08.10.2014How do you search for a suitable property developer?30
27.02.2015Construction project with a developer without an official building plan, is a down payment required?12
01.03.2015The developer does not build according to the plan14
15.04.2015Duplex construction: Joint or separate developer?20
02.10.2015Idea collection for floor plan72
24.04.2017Lighting in hallway and kitchen: Are recessed ceiling spotlights needed?19
21.07.2017Buying a terraced house from a developer - contract content?71
04.12.2017Floor plan of a two-family house, ground floor and attic apartment25
30.08.2019Is it sensible to have a building surveyor for condominiums from the developer?11
26.01.2021Delete land registry entry from the developer18

Oben