Load-bearing foundation structure, foundation cushion for floor slab

  • Erstellt am 2020-04-29 17:38:10

Vicky Pedia

2020-06-05 00:26:52
  • #1

It’s not so easy right now! Insiderr!!!
 

fach1werk

2020-06-05 09:04:27
  • #2
Vicky Pedia, come on, please pull yourself together, it sounds like with us and that was terrible for us. Maybe something can still be adjusted and things will go better for this client.

I am not familiar with dynamic probing tests in their significance, only load plate tests. I would spend the money for that as close as possible before the slab is poured. Did you leave the foundation cushion as per the order at Heinz von Heiden?

It is advantageous if you no longer make complaints only by phone. You can still speak politely with each other and communicate the email or registered letter as a formality and send it afterwards.

Site managers from Heinz von Heiden have a requirement within which time they must process and respond to emails. However, according to our experience, they do not manage this. Therefore, they are quite keen on communication methods that do not fall under this requirement and control option, phone calls and SMS, for example. Needless to say, this way clients could not keep any evidence. But this can become necessary very quickly.

I wish you a construction project that you enjoy!

Best regards Gabriele
 

Pet1234

2020-06-05 23:45:33
  • #3
Thank you, dear Gabriele. Yes, the foundation cushion is included in the contract, but only 30cm. The fillings are of course to be billed separately and were also offered separately by the contracted civil engineer. The cushion is between 45 cm and 1.60m high...
 

fach1werk

2020-06-06 07:38:18
  • #4
That it is necessary to add to the founding buffer included in the contract is normal. I did not meet a single Heinz von Heiden customer for whom it was sufficient. It is good that the founding buffer remained with Heinz in the contract.

Best regards
Gabriele
 

11ant

2020-06-06 13:21:28
  • #5
That reads to me like a contradiction: included but topped up?
 

Andre77

2020-06-06 22:05:17
  • #6
Then I am the first, Gabriele
 

Similar topics
16.06.2011Conclude a construction contract under reservation?10
13.09.2012Feeling pressured into a contract, is that normal?17
29.09.2011Is construction pre-planning without signature / contract legally valid?12
22.09.2012Who else fell for a contract with a reservation clause? - Search13
23.11.2015Land value too low - therefore no approval for construction financing79
20.04.2020Installation of the wastewater pipeline for new construction10
11.03.2023Plot Single-family house C630 Heinz von Heiden at the location Saxony64
10.08.2022Foundation cushioning Town & Country house construction service description10
31.01.2024Wall construction comparison Heinz von Heiden vs. Team Massivhaus16

Oben