slavik
2014-08-26 23:02:00
- #1
Thank you for all the replies! I never expected to get so many – I’m new here. Sorry for my late response.
: Developer, yes! He represents the architect, civil engineer, and everything else for us. In the meantime, we are trying to take over the construction management. But the contract has been signed for more than a year now, and we are stuck with his "slow" (forgive the expression) way of working. However, a lawsuit would only prolong the whole thing. So we have no leverage that would help us.
: Yes, at least double glazing. Our developer might want to save money on us.
I took out my energy certificate. Unfortunately, the data about the basement doesn’t tell me much. I’ll attach the page here. Can you read anything from it?

: Developer, yes! He represents the architect, civil engineer, and everything else for us. In the meantime, we are trying to take over the construction management. But the contract has been signed for more than a year now, and we are stuck with his "slow" (forgive the expression) way of working. However, a lawsuit would only prolong the whole thing. So we have no leverage that would help us.
: Yes, at least double glazing. Our developer might want to save money on us.
I took out my energy certificate. Unfortunately, the data about the basement doesn’t tell me much. I’ll attach the page here. Can you read anything from it?