Is the soil report for construction also usable for basement construction?

  • Erstellt am 2019-07-04 21:00:47

neutronbx

2019-07-04 21:00:47
  • #1
Hello everyone,

we had a soil investigation report conducted for our new build of a single-family house. The plan was to forgo a basement and build on a slab. This has now changed and we are planning with a basement. Unfortunately, the boreholes were only drilled 3m deep due to the planned slab.

Now my two questions:

1. Can I still use this report for planning a basement or do I have to bite the sour (more expensive) apple and have another one done?

2. Is the soil suitable for a basement or is it better to avoid it due to high additional costs? I really can't interpret all the key values.
 

neutronbx

2019-07-06 15:21:26
  • #2
No one has an idea or advice?
 

rick2018

2019-07-06 19:08:27
  • #3
You will have to dig deeper than 3 meters for the basement. Either a new survey, which also won't give you 100% certainty, or simply take the risk. In my experience, I would do it without an additional survey.
 

neutronbx

2019-07-07 15:34:22
  • #4


Thanks for the post. Do you mean I have to dig deeper than 3 m during the excavation or when drilling for the soil survey? Why would you do it without another expert report in my place? As I said, I have no knowledge of all the geological parameters at all.
 

rick2018

2019-07-07 15:58:58
  • #5
Think that you have to dig at least 4 meters. One story height + ceiling + floor + floor slab + substructure. If you want to drill again, then 5-6 meters for safety. Why I would take the risk: how likely is it that it changes compared to the 3 meters? How many drillings do you have? We drilled at 3 locations, made 5 test pits, and still had a hole from the old house. In the end, a lens of clay ran across the construction window. We had not found that with any inspection. That’s what I meant that another drilling does not give you 100% certainty. Your soil is Z0 max. Z1.1. So easy to get rid of. Maybe you can also use it on the property for modeling. Soil class 4-5 is also easy to remove with smaller machines. If you are willing to bear the costs for a basement, your soil is no problem.
 

Similar topics
05.06.2010Basement made of high perforated bricks or concrete?11
31.05.2015Wastewater pipe concreted in the floor slab at the wrong location29
26.10.2012External perimeter insulation floor slab, basement mold risk11
09.06.2013Costs of earthworks without basement15
01.07.2013Additional insulation in the Ytong basement (36 cm)14
09.04.2015Sacrifice the basement for 20m² more living space?15
10.08.2015In which season of the year is it best to bring screed into the basement10
06.10.2015Correct formulation for a waterproof basement11
24.10.2015Built without a basement & regretted?77
08.12.2015uninsulated basement = wet basement?20
20.08.2016Base slab vs strip foundation15
27.03.2017Backfilling for foundation slab25
28.06.2017Basement costs - Is the floor slab offset?17
15.03.2018When is a slope a slope? Basement vs. slab19
14.03.2018Slight slope, building with a basement or a floor slab?16
03.03.2018Price difference between ground slab and basement. Can it be estimated?32
14.10.2019Dampness in the basement on the floor slab and walls25
11.01.2021Basement or slab? - Cost estimation24
22.09.2022Basement without additional flooring / cleaning floor slab34
03.03.2024Basement or ground slab: which is more sensible for the property situation?55

Oben