The BB will then be adjusted elsewhere so that the offered AB final price will not be much higher. Previously, turnkey houses included painting work and floor coverings. A large nationwide house construction company has meanwhile removed the construction waste container and other "small things" to offer a low price. In addition, the painting of the roof sheathing is considered part of the painting work, so you have to climb the ladder and paint it yourself. Elsewhere, this is still included. If prices shift for the construction, there will soon not even be tile coverings in the hallway, bathroom, and kitchen. The final price nevertheless changes hardly at all. But of course, the construction costs will ultimately be higher for the end consumer because tile installation costs are added on top. So there is more insulation but fewer features for the same money. This will hardly be noticed by the end consumer who will be looking for a house in 2015 or -16.