Is it possible to switch from basic supply to construction power?

  • Erstellt am 2019-09-27 09:56:11

Domski

2019-09-27 14:59:27
  • #1
You will only need the construction power as long as the final meter is being installed. Whether the construction power meter can simply be transferred to your meter box and you can take the tariff from the construction power box with you, I would first check with the network operator. A fixed-term contract for construction power only makes sense if you can take the contract with you.

With us (EAM, North Hesse), this is strictly prohibited. You will get a new meter.
 

HilfeHilfe

2019-09-27 18:25:53
  • #2
I wouldn't bother with the stress, not that you end up paying twice in the end
 

Andre77

2019-10-04 21:59:30
  • #3
Also here again for the sake of completeness: Yes, it works, you can switch. Self-test successful.
 

Similar topics
04.04.2016Heat pump on separate meter or together with household electricity20
06.10.2021Photovoltaic system / heat pump, do you have 2 meters?55
14.06.2021Separate meter and electricity tariff for air-to-water heat pump sensible?103
03.07.2021Separate water meter for garden water - How to read the meter21
13.11.2021Requirements for ancillary apartment, wiring, meters, etc.13
14.06.2023Heat pump and household electricity all through one meter25
25.09.2023The supplier has incorrect meter numbers in the system - what to do?42
31.10.2023Extra meter for heat flow tariff (heating electricity tariff) yes/no?36
02.10.2024Photovoltaic - Position on the roof and only one meter?10
07.01.2025Is a heat pump meter sensible? According to the bill, yes, but is that correct?13

Oben