Is a revision shaft necessary for us?

  • Erstellt am 2019-02-19 07:52:19

pffreestyler

2019-02-19 07:52:19
  • #1
Hi,

we will be laying the rainwater and wastewater pipes outside on Saturday.

Attached are the positions showing approximately how the pipes will run


My main concern is the wastewater, whether I should install an inspection chamber somewhere there. The pipe length from the bathroom is about 14m and from the utility room about 10m. If a chamber is needed, it would rather be near the bathroom. The experts said that for this length it can be done without, but it is not strictly necessary.

Checking with the neighbors is not very helpful. So far only two have started. One has two chambers, as his pipe lengths are significantly longer, and the other is doing it with me on Saturday and is skipping the chamber at a similar pipe length because he says that in case of problems one can access the transfer chamber since it is not that far away. That is not really representative yet.

What do you think in my case? Necessary? Not necessary but advisable? Not needed because the transfer chamber is nearby?
 

Steven

2019-02-19 07:57:15
  • #2
Hello

I have about 8 meters from the house to the sewage connection. Halfway along the route I have an inspection shaft. 2 120cm concrete sewage pipes. A conical shaft on top and closed with a concrete cover. It was a day of digging (the excavations for the house were already done long ago, so I worked with a shovel and spade) but with clogged HT pipes I always get close to the cause.

Steven
 

does02

2019-02-19 07:59:26
  • #3
I would do it too or rather have done it too. Pipe lengths similar! In DN400 plastic it is completely sufficient in my opinion.
 

Nordlys

2019-02-19 08:50:51
  • #4
Exactly. Do that. Having is better than needing.
 

pffreestyler

2019-02-19 09:48:09
  • #5
Oki doke, will be ordered later. DN400 plastic is by the way exactly what I had offered it will be placed right in front of the bathroom so that I can take the walk-in one. Driveable costs a chunk of money more.
 

Zaba12

2019-02-19 11:15:04
  • #6
...and see what the development plan stipulates for drainage.

For us, the mandatory requirement is: 2x inspection chambers and a cistern. Totally crazy, one inspection chamber could have been saved because of the cistern. It's just as well that they were not as expensive in individual contracts as with the general contractor.
 

Similar topics
19.01.2020Roller shutters: Aluminum vs. Plastic40
16.08.2020Roof undershots plastic?14
16.11.2015Rainwater cistern: Useful? Necessary? Costs?25
26.01.2021Front door - plastic or aluminum56
27.05.2016Plastic fittings/water pipes and insulating underfloor heating beneath screed?40
18.02.2018Dimension Cistern - Building Plan Tips62
16.09.2016Roller shutters - plastic or aluminum?16
17.07.2017Ideas for frost-resistant water supply cistern?13
13.02.2022Types of windows: Plastic, wood, or aluminum? Recommendations/experiences?43
29.11.2018Roller shutter cover upper floor - plastic or aluminum? Experiences?12
23.03.2021Cistern in the garden / driveway36
12.03.2020Roof overhang cladding wooden or plastic panels?30
14.06.2020Wood-aluminum windows vs. plastic windows22
22.07.2021Cistern for garden irrigation - Which pump?69
13.04.2021Interior doors - Snap locks & latches made of plastic!?24
09.05.2021Ordering a cistern (concrete) online - experiences?21
16.07.2021Plastic and aluminum roller shutters10
13.08.2015New plastic water pipeline11
15.01.2024Is a cistern economically viable through pumping?30

Oben