Guido1980
2021-02-15 11:28:41
- #1
There is also a supply shaft in our case, but the problem is that the supply shaft ends in a dormer and then all the pipes would have to be routed through the dormer roof to the attic. This does not work due to space constraints. Supply and exhaust air for the [Kontrollierte-Wohnraumlüftung] is in our basement wall because the [Kontrollierte-Wohnraumlüftung]-system is located in the basement in the utility room.
The connections between [KG] and [EG] and [EG] and [DG] run through the supply shaft, just not between [DG] and the attic. These are the pipes leading to the supply and exhaust air ceiling nozzles of the attic.
Since the pipes are still being staggered or divided into two rafter fields, it will now be executed as in your picture 1 with insulation behind it.
The connections between [KG] and [EG] and [EG] and [DG] run through the supply shaft, just not between [DG] and the attic. These are the pipes leading to the supply and exhaust air ceiling nozzles of the attic.
Since the pipes are still being staggered or divided into two rafter fields, it will now be executed as in your picture 1 with insulation behind it.