Schnubbihh
2023-09-28 15:48:02
- #1
Hello dear community,
I have a question about the buildability of a plot in the second row and the necessary steps for it.
Situation:
- Large plot with existing building was split by the owner into two equally sized parcels (both approx. 545 sqm)
- Owner keeps the front plot, we want to buy the rear plot
- Access to the rear plot is only possible via the front plot (no flag lot)
- Owner of the front plot wants to demolish the old house and garage soon and potentially rebuild (timing not fixed)
- Location of the plot: Hamburg
- Floor area ratio-1 = 0.2
- Floor area ratio-2 = 0.3
My understanding:
- Registration of a building encumbrance AND easement (in the land register) is required so that I can build and access the rear plot without problems
- Access areas are deducted from the floor area ratio-2 for both the front and rear plots
Question:
- What is the correct procedure regarding the purchase of the plot, registration of the building encumbrance and easement? How can I best protect myself as a buyer to ensure there are no problems?
- Will there potentially be major problems with the front plot regarding floor area ratio 1 & 2? (not my problem, but I would still like to understand) According to the construction stage plan, an area at the front by the street must be kept free from building and must therefore also be deducted from the plot size for the floor area ratio calculation.
I would be very grateful for your expert advice!
I have a question about the buildability of a plot in the second row and the necessary steps for it.
Situation:
- Large plot with existing building was split by the owner into two equally sized parcels (both approx. 545 sqm)
- Owner keeps the front plot, we want to buy the rear plot
- Access to the rear plot is only possible via the front plot (no flag lot)
- Owner of the front plot wants to demolish the old house and garage soon and potentially rebuild (timing not fixed)
- Location of the plot: Hamburg
- Floor area ratio-1 = 0.2
- Floor area ratio-2 = 0.3
My understanding:
- Registration of a building encumbrance AND easement (in the land register) is required so that I can build and access the rear plot without problems
- Access areas are deducted from the floor area ratio-2 for both the front and rear plots
Question:
- What is the correct procedure regarding the purchase of the plot, registration of the building encumbrance and easement? How can I best protect myself as a buyer to ensure there are no problems?
- Will there potentially be major problems with the front plot regarding floor area ratio 1 & 2? (not my problem, but I would still like to understand) According to the construction stage plan, an area at the front by the street must be kept free from building and must therefore also be deducted from the plot size for the floor area ratio calculation.
I would be very grateful for your expert advice!