HäuslebauerEE
2018-07-29 17:49:18
- #1
Hello everyone,
we have purchased a fully developed plot and discussed the ancillary construction costs with a general contractor during the sales meeting. €3500 was allocated for the item wastewater.
We also obtained quotes for the earthworks. The points "laying KG pipes" and the inspection shaft as well as the cistern were offered to us directly by the earthworks contractor. He told us, "Everything related to wastewater exiting the property is included in his offer."
Now we are wondering what the €3500 wastewater cost refers to. What work is still missing then? From my understanding, the pipe that goes from the property to the local wastewater system should still be connected, but that can’t possibly cost €3500, can it? Could you possibly help me shed some light on this?
Best regards
we have purchased a fully developed plot and discussed the ancillary construction costs with a general contractor during the sales meeting. €3500 was allocated for the item wastewater.
We also obtained quotes for the earthworks. The points "laying KG pipes" and the inspection shaft as well as the cistern were offered to us directly by the earthworks contractor. He told us, "Everything related to wastewater exiting the property is included in his offer."
Now we are wondering what the €3500 wastewater cost refers to. What work is still missing then? From my understanding, the pipe that goes from the property to the local wastewater system should still be connected, but that can’t possibly cost €3500, can it? Could you possibly help me shed some light on this?
Best regards