ypg
2018-07-31 23:16:40
- #1
Well... 200€ more for the approval from the building authority.
I think the offer from the general contractor and the earthworks contractor overlap heavily.
For us, the earthworks contractor connected the sewage cistern with the rainwater system, also a cistern, connected to the downpipes, done together. Cost in 2013: 5500€.
I think the offer from the general contractor and the earthworks contractor overlap heavily.
For us, the earthworks contractor connected the sewage cistern with the rainwater system, also a cistern, connected to the downpipes, done together. Cost in 2013: 5500€.