chjais
2017-06-30 09:28:01
- #1
We are building a house in the Nürnberger Land and are currently still waiting for the building permit. In the meantime, we have the result of our soil survey.
The groundwater is supposed to be at about -2 meters. So, for the basement construction, we have to pump out groundwater, need extra insulation, and additionally waterproof light wells.
There is an appointment to discuss with the developer and civil engineer scheduled for next week. Then we are supposed to receive a more precise offer for that.
Has anyone had experience with this and how high were the additional costs roughly at the end for you in comparison?
Thanks in advance for the answers.
The groundwater is supposed to be at about -2 meters. So, for the basement construction, we have to pump out groundwater, need extra insulation, and additionally waterproof light wells.
There is an appointment to discuss with the developer and civil engineer scheduled for next week. Then we are supposed to receive a more precise offer for that.
Has anyone had experience with this and how high were the additional costs roughly at the end for you in comparison?
Thanks in advance for the answers.