brian73
2013-04-26 20:00:53
- #1
Hello, the construction company is obliged to build us a KfW-70 house (if we sign). Therefore, I currently assume that the option gas heating./ventilation with heat recovery naturally meets the required standards just as well as gas/solar. But we will follow up on that again.
There has not been any direct energy consultation on this yet. KfW70 package (proofs and consumption forecast cost us 600.-) according to the construction contract. Does anyone else have an idea what might - roughly estimated - be the better alternative?
There has not been any direct energy consultation on this yet. KfW70 package (proofs and consumption forecast cost us 600.-) according to the construction contract. Does anyone else have an idea what might - roughly estimated - be the better alternative?