crion
2019-12-09 09:23:21
- #1
Good morning everyone!
With our house construction (KFW 55 Standard), we are now facing the problem just before the start of construction that some points have come up which require additional financing, for example the delayed feedback from the structural engineer...
So far, we have a loan with a long (~25 years) interest period, without KfW elements.
Would it be possible to get a KfW loan (Program 153?) for the additional financing (~15 - 20 k)?
If I understood correctly, it should be possible before the start of construction, and so far, luckily/unfortunately, no construction worker has been on our land...
Best regards,
Christian
With our house construction (KFW 55 Standard), we are now facing the problem just before the start of construction that some points have come up which require additional financing, for example the delayed feedback from the structural engineer...
So far, we have a loan with a long (~25 years) interest period, without KfW elements.
Would it be possible to get a KfW loan (Program 153?) for the additional financing (~15 - 20 k)?
If I understood correctly, it should be possible before the start of construction, and so far, luckily/unfortunately, no construction worker has been on our land...
Best regards,
Christian