Financing and house construction planning - is this okay? Experiences?

  • Erstellt am 2015-03-23 21:12:57

M.Dreising

2015-03-23 21:12:57
  • #1
Hello! We still plan to build a house this year. The allocation of the plots will take place in mid-April. We plan the costs as follows --> please tell us if this is realistic - Plot + additional costs (notary, property transfer) approx. 570sqm (1sqm - 158.50) 100,000 - Total house construction for 150sqm (offer is available) total 170,000 Turnkey house 140,000 of which own work electrical, sanitary, heating, laminate, painting work Total material costs 30,000 - Additional construction costs 22,000 - Preparation of documents for building application 1,500 - Building application 1,000 - Soil survey 1,500 - Cadastral office 2,000 - Construction electricity + construction water 1,000 - Connection costs 8,000 - Outdoor facilities 8,000 - Buffer 8,000 Are there any more additional construction costs? We imagine the financing as follows. Income: He 2,800, she with child benefit 800 - total 3,600 Expenses monthly approx. 2,200 Monthly rate approx. 1,200 What is the most sensible way to arrange the financing? We have 40,000 equity We need to borrow 260,000 Definitely 50,000 from the KfW (it should become a KfW 70 house) Also repay these 50,000 with a home savings contract? And the remaining 210,000? In a home savings contract with BHW 1.5% for the first 10 years then 1.25%? An amortized loan with fixed interest 15 years 2.2% interest? How can this be done best? I look forward to your experiences and opinions!
 

Legurit

2015-03-23 21:30:06
  • #2
Is structural engineering included in the documents? How about the Energy Saving Ordinance, Blower Door?
 

M.Dreising

2015-03-23 21:58:15
  • #3
yes, structural analysis and Blower Door Test are included. what exactly is the Energy Saving Ordinance?
 

Legurit

2015-03-23 22:07:28
  • #4
You have to prove that I comply with the energy saving ordinance, or if you build [Kfw70] then that as well. Who is planning your house? Usually, the planner does that too, since they also design the technology and walls.
 

M.Dreising

2015-03-23 22:27:38
  • #5
Oh, the planning is handled by a prefab house company. The insulation will be done as well, furthermore there will be a solar system that is supposed to heat water and support the heating.
 

Legurit

2015-03-23 22:48:32
  • #6
Then it's best to ask Spitz again whether the [Energieeinsparverordnung Nachweis] is included in the price.
 

Similar topics
19.06.2009Evaluation of the KfW 60 House Contract: Credit Check for House12
21.08.2011Which heating system is suitable for our Kfw 70 house without a basement?15
09.07.2015Energy Saving Ordinance Proof vs. Energy Saving Ordinance Proof + KfW-70 Proof13
19.10.2015New energy saving regulation from 2016 -> What to build?30
30.10.2015Can the building application be submitted this year?14
09.05.2016Compliance with the 2016 Energy Saving Ordinance with the following heating14
16.03.2016Chimney no longer allowed from 01.04.16 in KFW 55?19
25.01.2017Blower Door Test for KfW 70 according to the 2012 standard?15
11.02.2017KfW loan in 2017 for a house under the 2016 Energy Saving Ordinance17
09.09.2019Where is it most worthwhile to exceed the requirements of the Energy Saving Ordinance?14
21.10.2019Financing with building savings loan + KfW + subordinated loan17
19.12.2019Blower Door Test 1.7 with two hints22
20.01.2020Build a multi-family house according to the Energy Saving Ordinance or KFW55?29
04.05.2020Energy Saving Ordinance or Thermal Insulation Certificate Offer17
01.07.2020Financing via KFW 55 or still from the bank?18
29.01.2021Is the 2014 Energy Saving Ordinance a KfW standard?24
03.11.2020Single-family house with KfW55/controlled residential ventilation or Energy Saving Ordinance standard - experiences and opinions?22