Good day,
We have received a building plot, unfortunately the plot is about 1.30 meters lower than the street level.
We would not want a basement, as the plot is located in a dead-end street with a slope (rainwater accumulation).
How would be the best way to proceed now with filling and creating strip foundations? How deep should one dig?
The base slab should be at least 30 cm higher than the street level.
The plot has 500 m2.
Thank you very much for your suggestions.