Hello everyone,
We have bought a house from 1921 (110 sqm living space) and want to add a floor (approx. 55 sqm) and renovate the house (preferably with KfW 261, if still available).
We have meanwhile found an architect who would make a rough preliminary planning for the building inquiry for the extension and then draw the building plans (phases 1-4). The energy consulting will be taken over by someone else.
The fee calculation according to HOAI is clear to me so far. We had overall set a budget of up to 450,000€ for the extension (approx. 250,000€) and renovation (approx. 200,000€).
Now, however, the architect has assumed 450,000€ as the construction sum to calculate his fees and is thus already over 20,000€ for phases 1-4.
Is that correct?
I had calculated a lower amount of total eligible costs with 250,000€ gross for the extension.
Thank you very much for your time and help!
We have bought a house from 1921 (110 sqm living space) and want to add a floor (approx. 55 sqm) and renovate the house (preferably with KfW 261, if still available).
We have meanwhile found an architect who would make a rough preliminary planning for the building inquiry for the extension and then draw the building plans (phases 1-4). The energy consulting will be taken over by someone else.
The fee calculation according to HOAI is clear to me so far. We had overall set a budget of up to 450,000€ for the extension (approx. 250,000€) and renovation (approx. 200,000€).
Now, however, the architect has assumed 450,000€ as the construction sum to calculate his fees and is thus already over 20,000€ for phases 1-4.
Is that correct?
I had calculated a lower amount of total eligible costs with 250,000€ gross for the extension.
Thank you very much for your time and help!