whoracle
2023-08-03 08:28:35
- #1
Hello everyone,
I would be interested in your assessment of the offer from our energy consultant. I do not want to start any fundamental discussions. The whole thing will probably be a passive house and we want to take advantage of the KFW 297 funding including QNG.
1) Standard-compliant energy calculation:
- Creation of a 3D planning model for the following calculation steps
- Creation of a concept for thermal insulation + system technology
- Creation of a standard-compliant calculation according to the Building Energy Act 2023
- Standard-compliant calculation according to PHPP (Passive House Planning Package)
- Determination of heating loads from the PHPP calculation
- Calculation of new building variants and coordination with the funding guidelines
- Discussion of the calculation results and definition of the structural measures
2180.00 euros net
2) Preparation of the basics and confirmations for KFW (BEG)
- Online confirmation for the KFW application; Program 297
- KFW confirmation after implementation of the measure, including final on-site inspection
- Update of the basics Energy Saving Ordinance / Building Energy Act calculation
1180.00 euros net
3) Preparation of the sustainability certification necessary for Efficiency House 40 NH for KFW (QNG)
- 1st stage by our certified office according to BIRN NH:
- Preparation of the certification documents for the sustainability system for residential buildings in Germany according to the ancillary construction costs system.
- Preparation of the necessary and extensive documentation, evidence, calculations, and review of the construction documents provided by the client
5600.00 euros
- 2nd stage certification by BIRN NH:
- Preparation of the certification by BIRN as an external institute for the sustainability system for residential buildings in Germany according to the ancillary construction costs system.
Unit price 1280.00 euros
4) Implementation of construction supervision for quality assurance as an approved expert for necessary evidence for the KFW
- On-site inspection of the craftsmanship
- Construction site documentation according to KFW guidelines
- Preparation of a usage certificate
3 units 3.5 h 105 euros net/hour 1102.50 euros net
(Estimated effort approx. 3 inspections x 3.5 hours)
5) Preparation of a standard-compliant photovoltaic simulation according to DIN 18599 as a basis and confirmation for KFW EFF house
- Preliminary planning for calculating the performance, yields of the photovoltaic system for the available roof geometries
220.00 euros net
6) Verification of airtightness requirements according to 4108-7 or DIN EN ISO 9972,
- as 1st measurement for quality assurance during the construction state, including leakage detection throughout the entire building.
- as 2nd measurement after completion of interior construction trades, procedure A
- Preparation of a test report and test certificate
680.00 euros / measurement
2 measurements 1360.00 euros net
7) Preparation of a detailed thermal bridge calculation
A detailed thermal bridge calculation is necessary and meaningful for an energy efficiency building in most cases.
The scope can only be roughly estimated at the current planning stage.
The effort for a usual thermal bridge calculation is about 150 euros/piece.
Unit price 150.00 euros/piece estimated scope 23 pieces
3450.00 euros net
In total, this amounts to just under 20k gross, whereby you naturally save about 50k in interest over 10 years.
Is all this really necessary and somewhat realistic?
Thanks and best regards
I would be interested in your assessment of the offer from our energy consultant. I do not want to start any fundamental discussions. The whole thing will probably be a passive house and we want to take advantage of the KFW 297 funding including QNG.
1) Standard-compliant energy calculation:
- Creation of a 3D planning model for the following calculation steps
- Creation of a concept for thermal insulation + system technology
- Creation of a standard-compliant calculation according to the Building Energy Act 2023
- Standard-compliant calculation according to PHPP (Passive House Planning Package)
- Determination of heating loads from the PHPP calculation
- Calculation of new building variants and coordination with the funding guidelines
- Discussion of the calculation results and definition of the structural measures
2180.00 euros net
2) Preparation of the basics and confirmations for KFW (BEG)
- Online confirmation for the KFW application; Program 297
- KFW confirmation after implementation of the measure, including final on-site inspection
- Update of the basics Energy Saving Ordinance / Building Energy Act calculation
1180.00 euros net
3) Preparation of the sustainability certification necessary for Efficiency House 40 NH for KFW (QNG)
- 1st stage by our certified office according to BIRN NH:
- Preparation of the certification documents for the sustainability system for residential buildings in Germany according to the ancillary construction costs system.
- Preparation of the necessary and extensive documentation, evidence, calculations, and review of the construction documents provided by the client
5600.00 euros
- 2nd stage certification by BIRN NH:
- Preparation of the certification by BIRN as an external institute for the sustainability system for residential buildings in Germany according to the ancillary construction costs system.
Unit price 1280.00 euros
4) Implementation of construction supervision for quality assurance as an approved expert for necessary evidence for the KFW
- On-site inspection of the craftsmanship
- Construction site documentation according to KFW guidelines
- Preparation of a usage certificate
3 units 3.5 h 105 euros net/hour 1102.50 euros net
(Estimated effort approx. 3 inspections x 3.5 hours)
5) Preparation of a standard-compliant photovoltaic simulation according to DIN 18599 as a basis and confirmation for KFW EFF house
- Preliminary planning for calculating the performance, yields of the photovoltaic system for the available roof geometries
220.00 euros net
6) Verification of airtightness requirements according to 4108-7 or DIN EN ISO 9972,
- as 1st measurement for quality assurance during the construction state, including leakage detection throughout the entire building.
- as 2nd measurement after completion of interior construction trades, procedure A
- Preparation of a test report and test certificate
680.00 euros / measurement
2 measurements 1360.00 euros net
7) Preparation of a detailed thermal bridge calculation
A detailed thermal bridge calculation is necessary and meaningful for an energy efficiency building in most cases.
The scope can only be roughly estimated at the current planning stage.
The effort for a usual thermal bridge calculation is about 150 euros/piece.
Unit price 150.00 euros/piece estimated scope 23 pieces
3450.00 euros net
In total, this amounts to just under 20k gross, whereby you naturally save about 50k in interest over 10 years.
Is all this really necessary and somewhat realistic?
Thanks and best regards