I would be afraid of mold if a lot of warm and thus moist air from the upper floor reached the unventilated attic. However, I do not see that here now.
Let's summarize. Klemmfilz 160, climate membrane, roof battens and formwork boards, adhesive tape for the overlaps, some cartridges of foil adhesive, two men, two days.