Create an insulated technical room for the gas boiler in the attic

  • Erstellt am 2019-09-28 05:57:34

Golfi90

2019-10-06 18:56:46
  • #1
I hope that in 1-2 weeks the Rauspund will be installed and we can start with the insulation. Today, during the conversation with our plumber, we definitely agreed that the heating and ventilation will be placed in the attic... That will give a lot of space in the utility room and then the effort for insulation will be worthwhile.
 

Nordlys

2019-10-06 19:11:24
  • #2
A few more tips from experience. Treat yourself to one of those insulation cutting knives. Make sure the clamp felt is not wet or damp before processing. For the foil, a pneumatic stapler is almost indispensable to stretch it tight. It's somewhat fiddly otherwise. Especially with a hip roof.
 

Golfi90

2019-11-05 14:16:03
  • #3
Rauspund is in its final stages and will probably be finished on Friday!

Saturday morning at 8:30 am the 160mm Klemmfilz will arrive! The (admittedly inexpensive) Klimamembran and adhesive tape and connection adhesive should also be delivered by DPD Poten during the week...
 

Nordlys

2019-11-05 20:34:06
  • #4
Well, then you have a fulfilling weekend
 

Similar topics
23.07.2021Insulate cold roof with clamp felt, price53
05.04.2021OSB or tongue and groove boards for flooring in an expandable attic?24
11.08.2019Rough-sawn boards or OSB panels for the attic (possible later expansion)10
15.11.2023Laying tongue and groove boards in the attic - tips35

Oben