nordanney
2020-01-17 18:29:06
- #1
An old man maybe, a professional craftsman not. You haven't dealt with craftsmen yet, have you? And if you have, then only with ones who ripped you off.So a single man easily needs 2-3 days to gut the old bathroom. That leaves 9 days. Then straighten the walls. So plastering or drywall. Another 3 days gone. Remaining 6. Level the screed. 0.5 days, let's leave that out. Rough installation also takes 1-2 days.