Hello everyone,

I urgently need your help. I applied for construction power through an electrician. Since the electrician does not rent out construction power distributors, I obtained one myself from a rental service.

The network operator came yesterday and connected the construction power distributor I rented to the network.

Today I checked on the construction site to see if the power was working. There was only a label inside the construction power distributor saying "Power up to the main switch." I then activated the main switch and inserted the fuses. The load break switch was also inserted. However, I am not getting any power from the sockets. Do any other connections need to be made on the construction power distributor? I assumed the network operator would take care of that. Allegedly, power should be available up to the main switch. How did it work for you?

On Tuesday I have to submit a completion notification and on Thursday the basement builder is coming!

Thanks for your help!
 

Vicky Pedia

2020-09-19 00:03:01
  • #2
Hello, that can and must be done by your electrician. You can't possibly judge what doesn't work there. So get a professional, you are paying him anyway!!
 

danixf

2020-09-19 01:47:40
  • #3
Meter installed? The network operator is only responsible up to the transfer point. After that, it’s yours.
 

ypg

2020-09-22 23:44:27
  • #4
It was like this with us: electrician for the construction site power box, provider for the electricity. We had to take care of both.

but tell me: what is your problem now or what is being done?
 

homer092

2020-10-02 08:44:24
  • #5
What does the electrician say about it? Actually, it is his responsibility, of course it must be contractually/order-wise documented. The VNB is responsible, as in the house, only up to the transfer point / meter. Everything beyond that concerns him little... Hopefully you are aware that construction power distributors must be checked before commissioning, additionally daily RCD tests (also to be carried out by the user), monthly and semi-annual electrical measurements, visual inspections, ISO measurements, etc. by a professional.
 

Similar topics
26.04.201616.03.16: Start of photovoltaic assembly60
04.04.2016Heat pump on separate meter or together with household electricity20
18.11.2016Electrician's invoice after 2.5 years - What are my rights?18
12.05.2017Is an advance payment to an electrician lawful?23
31.10.2018Network operator refuses gas home connection - Is this legitimate?11
11.11.2018Temporary power distributor - buy or rent?11
01.08.2019Trouble with the electrician / tolerance range?!42
20.02.2020What does the electrician do during the shell construction phase?19
23.03.2020Building law: Electrician refuses to continue78
21.07.2021Problem with the electrician - what would you do?78
06.10.2021Photovoltaic system / heat pump, do you have 2 meters?55
14.06.2021Separate meter and electricity tariff for air-to-water heat pump sensible?103
03.07.2021Separate water meter for garden water - How to read the meter21
08.10.2022Requirements for construction power box Construction power distributor12
14.06.2023Heat pump and household electricity all through one meter25
09.07.2023Electrician Cost Estimate - New Installation22
25.09.2023The supplier has incorrect meter numbers in the system - what to do?42
05.11.2023Maintenance contract for construction site power distributor37
02.10.2024Photovoltaic - Position on the roof and only one meter?10

Oben