Civil engineering: Costs for trenches of house connections

  • Erstellt am 2011-03-16 17:04:18

Bulla2000

2011-03-16 17:04:18
  • #1
Hello, besides the actual costs and fees of the utility providers (water, electricity), the trenches also have to be excavated. I wanted to have our civil engineer do that because he already has the machines and people on the property for the basement excavation, etc. According to the plan, roof drainage/drainage and wastewater are conducted in separate pipes/channels from the house to the transfer shafts. Maybe they can also be put together in one trench and only separated at the end.

Water and electricity – water is already on the property, electricity is only supplied with an empty conduit, the cable itself lies on the other side of the street.

What costs do I have to roughly expect, i.e. €/linear meter? Depth times standard height? I hope it won’t turn into a money pit.
 

detewe

2012-03-17 09:28:02
  • #2
Even though the question is a bit older.. we paid 80€ per m.
 

Frida

2012-04-30 14:32:57
  • #3
Acquaintances of ours paid 120 euros.
 

Similar topics
05.02.2014Costs/planning land, additional construction costs, turnkey, etc.27
08.11.2013Electricity at the house connection for provider - Installation of server cabinet10
07.07.2014Develop the property yourself13
31.03.2015Property / Financing amount / Insurance? Experiences10
21.03.2016Land Costs - Building and Financing a House29
02.03.2016Plot found in new development area - Build now?19
21.04.2016Is financing with land and equity possible like this?20
07.07.2016Electricity and water supply before construction begins?27
13.12.2016Lawn mower with electricity, battery, or petrol?47
08.08.2016Connection costs for telecom, cable, electricity10
08.08.2017Buy land with cash? How to build financing?44
13.06.2017Plot fully developed, additional costs?10
15.05.2018Water, gas, and electricity - disconnection and reconnection?10
23.07.2020Empty conduits on the property - ideas? - It's not too late yet :)103
15.05.2019Are the house connections already one meter on the property?16
28.07.2020Electricity/Telecom connection costs28
29.10.2020When is land development? Before construction road or after removal51
15.01.2021Development costs for a plot in the second row35
27.02.2021Prefabricated house including land planned - financing45
29.10.2022Is the property fully developed? - Cable is partially missing10

Oben