Hello,
I am currently facing a possible problem, which is probably my own fault. We want to build a house, and for this, we have concluded a contract for work. This includes the architectural service for the house. At the first appointment with the architect, the question arose whether he should include the garage in the plans; that would be done then. I should have asked about the additional cost right away. We were confident, and we liked him.
We roughly described what we imagined, but he kept assuring us that the design would be up to us later and that we would have 5 years for the construction. So that was fine for us.
After a lot of back and forth, we have now received the building application documents. Unfortunately, we feel that this was handled somewhat uncooperatively and partly incorrectly. We are supposed to delete the wrong information and correct it ourselves. That’s the background.
My actual problem now is that he drew the garage on the site plan at his own discretion and planned the drainage for it; there are no further documents. From our point of view, that is fine. We have now seen for the first time in the building application that he estimated construction costs of 46,000 €. In principle, acceptable, but now I fear that the good man will send us a princely bill even though this was never agreed upon or the planned cost framework defined beforehand.
I think as soon as we sign this, the matter is over for us. I fear that we will then have to pay something around 5,000 € just for this. Do you have any experience with that? He didn’t really plan anything for us, he just reserved the space on the property for it?
Thank you all
I am currently facing a possible problem, which is probably my own fault. We want to build a house, and for this, we have concluded a contract for work. This includes the architectural service for the house. At the first appointment with the architect, the question arose whether he should include the garage in the plans; that would be done then. I should have asked about the additional cost right away. We were confident, and we liked him.
We roughly described what we imagined, but he kept assuring us that the design would be up to us later and that we would have 5 years for the construction. So that was fine for us.
After a lot of back and forth, we have now received the building application documents. Unfortunately, we feel that this was handled somewhat uncooperatively and partly incorrectly. We are supposed to delete the wrong information and correct it ourselves. That’s the background.
My actual problem now is that he drew the garage on the site plan at his own discretion and planned the drainage for it; there are no further documents. From our point of view, that is fine. We have now seen for the first time in the building application that he estimated construction costs of 46,000 €. In principle, acceptable, but now I fear that the good man will send us a princely bill even though this was never agreed upon or the planned cost framework defined beforehand.
I think as soon as we sign this, the matter is over for us. I fear that we will then have to pay something around 5,000 € just for this. Do you have any experience with that? He didn’t really plan anything for us, he just reserved the space on the property for it?
Thank you all