JulMa79
2024-10-31 09:57:01
- #1
I would be interested in your experience building a semi-detached house. We are building a semi-detached house (we own both halves) and are currently dealing with the connection to the electricity and water networks. The plan is for us to do all the excavation ourselves from the start of the property to the utility room, and also lay the empty conduits there. Since both halves of the house are to be supplied from the same connection in the street, everything from the sewer/distribution to the property boundary only needs to be dug up once. Now we have received the offer from the network provider and, to put it mildly, we are shocked. The bill is supposed to be charged twice for exactly the same amount because there are two houses with two different house numbers. Is this actually the usual practice? I find it outrageous, especially since we are doing most of the work ourselves. The costs for the small stretch (5 meters) on the street and the connection inside the house amount to 2x 8,000€. Has anyone here had a comparable situation before?