Time required, a professional, a layman, 120 h a bungalow. That means three putty coats including crack tape. Primer, fiberglass painting twice, applying acrylic joints, setting stucco strips, priming the floor, leveling compound, sanding the same, gluing vinyl, setting baseboards, sealing joints where necessary. Start. 16.7. End today 17.00 hrs. If my brother were not a master painter, I would still be far from finished, and it would have turned out much worse. Karsten