Take a look at the pinned thread



Basically earthworks, infiltration/cistern, connections, site facilities like toilet, construction water/electricity, insurances. If it goes well, there is still something left over.
Of course, this is very general, but with the information available, that's all that can be done (and I can't do much more either )
 

GOAL18

2017-07-23 18:59:39
  • #2
Ok, yes you are not far off. We were offered the entire thing including the [Grundstück] for 540k€. So 400k for the house with the flat roof extension (separately 35k).

Further opinions are welcome!
 

stefanc84

2017-07-24 02:40:55
  • #3
Then Alex and I were not too far off either, but I still think €400k is a bit much for standard equipment. It should actually be possible to do it cheaper. But of course, there are currently no limits upwards.
 

GOAL18

2017-07-24 11:22:48
  • #4
That's exactly how I see it too. We have standard equipment - really without exception. What would be fair then? 300-350?
 

stefanc84

2017-07-24 12:44:26
  • #5
Basically what Alex listed, I see similarly. 150 sqm x €1,900 = 285k + €40k incidental construction costs + €40k garage and utility room (this is just a guess, I never asked for the cost of a garage) = 365k Exterior landscaping, taxes + fees, and any extras, such as controlled residential ventilation, are not included in this price yet. I’m building in Bavaria, with a similar price per square meter for the land, so construction costs should probably be comparable. We are at 320 turnkey for 145 sqm without garage – I want to do some things myself and will therefore get even lower. And we have no fireplace and no heating (district heating). I consider 300-350 turnkey not possible with a garage. Maybe 350, with ideal building ground and a cheap construction company. There are very large price differences – in my experience up to €80,000 for the same performance.
 

Leo

2017-07-24 12:53:17
  • #6
May one ask for the district and possibly the company?
 

Similar topics
08.12.2015Construction costs for KFW70 house with basement turnkey15
02.09.2013Angular bungalow on 800m² plot - financially feasible?16
05.02.2014Costs/planning land, additional construction costs, turnkey, etc.27
08.01.2014Where do we put the house and garage?10
02.07.2014Realistic purchase of land and new construction of a single-family house & how to finance it?20
14.07.2015Turnkey home. Free land17
11.11.2014The Old Suffering - Turnkey/Individual Contract38
26.11.2014House orientation / House entrance and garage14
05.10.2016House placement on the property, ideas sought23
02.03.2015Turnkey house construction, but with own room layout?17
21.04.2015Is a floor plan with a garage feasible on the property?29
13.03.2018Turnkey Construction Land and Prices79
15.08.2016Property - Building window - Location of house and garage44
20.12.2023Placement of house and garage on plot12
08.08.2017Buy land with cash? How to build financing?44
10.02.2020Place house, garage / carport on the property93
26.05.2019Property and house construction - realistic cost planning?11
20.10.2021Alignment of house and garage on the property18
29.06.2023Position of garage on property, specification in development plan22
26.03.2025Orientation of single-family house + garage on west-east plot with street on the west18

Oben