So you have 400,000 equity, the plot still needs to be purchased? Then about 600,000 euros remain for the house, or what is the plan?
That makes you very flexible in terms of construction method and you can easily reach 40 plus with the equipment.
Timber frame or solid construction have converged. There are no major technical differences.