Good evening.

We want to build!!! Yes exactly, but who should it be???
One thing we know, it should be a prefabricated house. One problem less;)!!!

Well, that’s why my wife, our little one, and I have already been to a large model house exhibition park several times to simply get an idea for ourselves and receive non-binding advice/get offers, which has BEEN very insightful so far, especially regarding the prices and price differences.

I also want to briefly share how our little house should/ought to/could look!!!

- 1 1/2-story single-family house on a slab / NO BASEMENT
- Knee wall at least 140cm
- Roof pitch steeper because an attic is to be used as additional storage
- Total 'living area' at least 140sqm
- As a heating system, we find the 'air-to-water heat pump' with underfloor heating and automatic ventilation very attractive, especially because we have to depend on fuel suppliers as is the case with gas or oil, among others.

Equity is available with which the plot + additional building costs will be purchased, or at least that is our plan.

So far, we have been to 4 providers.

From the advisors of the listed prefabricated house manufacturers, everything sounds very good and positive, but I am hoping more for you builders who are building or have built a prefabricated house and can give me/us helpful tips.

So that’s it for now, and I hope for helpful tips from you.

Best regards
 

MrPeter123

2013-08-18 07:42:09
  • #2
Hello Krautsch,

since we are currently building a prefab house, I want to give you a few tips:

1) There are now plenty of blogs where builders report on their construction work – this gives you a good impression of the company... Just google the company
2) When choosing the manufacturer, pay attention to more than just the insulation value of the exterior facade or the [KFW]-designation. Insulation of the facade is often just Styrofoam – this is not a remarkable advancement. Also pay attention to the roof (should be insulated at least as well as the facade), the windows, the floor, etc.
3) Before signing the contract, adapt the house as much as possible to your own needs – this reduces later cost jumps. For example, adjust the room layout, raise the knee wall, add extra sockets, fittings, etc.

Best regards and good luck
Peter
 

MrPeter123

2013-08-18 07:54:45
  • #3
...what I still forgot:
Serious companies provide as much information as possible and allow sampling before signing.
-Some companies advertise their windows with the great U-value. The U-W value is more important and is often omitted, instead only the better UG value is given.
-Some manufacturers build diffusion-open, i.e., without Styrofoam. Diffusion-open is probably a matter of belief if ventilation is present. On the other hand, diffusion-open insulation using wood-based panels has many other advantages (soundproofing, phase shift, (plaster should not mold), etc.).

Best regards, Peter
 

Similar topics
20.11.2012General questions about insulation10
06.02.2015Differences between prefabricated houses and alternatives?!18
15.03.2016Short questions about a prefabricated house offer?31
16.03.2021Ventilated, suspended facade instead of ETICS?29
14.11.2016Bathroom ventilation drips despite pipe insulation10
22.01.2017Single-skin vs. double-skin facade23
27.03.201724 cm Ytong + insulation or 36.5 cm Ytong63
27.03.2018Urge to sign due to price increase normal?50
21.08.2019Cost of clinker brick veneer facade?18
13.04.2020Insulation in the construction trailer, vapor barrier yes/no?12
27.02.2020Is the vapor barrier in the roof vapor-permeable? Yes? No!16
01.09.2020Are building plans with a 1m knee wall still up-to-date?16
24.07.2021Extension or knee wall height increase?12
09.06.2021House construction planning: solid house or prefabricated house? With or without a basement?80
14.12.2021Realistic financial planning for KFW40 prefabricated house?38
26.03.2022Which is more sensible: heat pump or insulation?33
18.09.2022Purchase of an existing single-family house prefabricated house year built 200078
22.05.2023Cost of prefabricated house: Solid construction vs wood?26
30.07.2024Solid house or prefab house - experiences?39

Oben