Hello everyone,

A few years ago, we purchased a plot of land outside the gates of Berlin (Dame-Spreewald); however, the topic of building a house is currently not of interest.

We now want to use the plot on weekends and prepare the garden for this purpose and build a tiny house/garden house on it.

Now some questions:

    [*]Since the garden house will have a fire pit (stove, oven) and is intended for longer stays, we probably need a building permit?
    [*]The real estate agent had given us the following figures: floor space index 0.4, site occupancy index 0.2. But as far as I know, there is no development plan. Does that mean I have to adhere to these figures and if so, I have to build "properly" right away? Where can I get clarity on this?
    [*]What documents do we need for a building permit? Do we need an official site plan? If yes, where can I get it most easily?
    [*]The plot is on a slope, so some earthworks need to be done. Do I also need a building permit for that?
    [*]What other legal framework conditions do we have to observe?

Best regards and many thanks for your answers!

lg, Hannes
 

Escroda

2019-08-14 10:34:55
  • #2
Yes. Then the realtor has to explain where he got the numbers from. If there has already been a preliminary building inquiry in which the surrounding development was examined regarding the extent of structural use, they could be binding. But with a TinyHouse, the values should be unproblematic. What do you mean by "properly"? If there is no development plan, the building project must fit into the surroundings, even a TinyHouse. At the building permit authority. Brandenburg Building Submission Ordinance - BbgBauVorlV It depends on whether you want to build near the boundary (see BbgBauVorlV). From the publicly appointed surveyor (öffentlich bestellter Vermessungsingenieur) BbgBO, §61, paragraph 1, Building permit exempt are: ... 9. Embankments and excavations with a height or depth of up to 2 meters and an area of up to 30 square meters, in the outer area up to 300 square meters, ... Building Code, Land Use Ordinance, Federal Immission Control Act (BImSch), Federal Nature Conservation Act (BNatSchG), ..., municipal statutes
 

Otus11

2019-08-14 10:41:08
  • #3
Most answers are provided by the Brandenburg Building Code. § 2, for example, contains definitions; small buildings and also embankments are "structural installations." § 59 BbgBO: "The construction, alteration, and change of use of structural installations as well as other installations and facilities, for which requirements are set forth in this law or in regulations based on this law, require a building permit, unless otherwise specified in §§ 60 to 62, 76, and 77." Providers of tiny houses should know what is needed to start with.
 

Tassimat

2019-08-14 12:25:15
  • #4
Maybe just look for an architect right away. A building application can be rejected multiple times quickly due to formal errors and it will drag on forever. In my city, you have to plan 3 months of processing time for a building permit, this binding deadline is often exceeded. Of course, plus the time for planning and application preparation.
 

nightdancer

2019-08-14 14:11:11
  • #5



First, I would check whether there is a development plan and if not, whether § 34 of the Building Code applies. If not, you bought a field and not a building plot.....
 

11ant

2019-08-14 15:54:44
  • #6

As far as I know, this Dame is spelled with an "h".
Isn't a motorhome enough as a temporary weekend retreat for a few years? After all, tiny houses are not given away for free either, are they?
 

Similar topics
15.02.2011Building permit application12
21.03.2015Property and Real Estate Agent16
19.03.2015Questions about the building permit21
05.04.2015Property reserved. Financing is pending52
28.11.2024Neighbor's lawsuit against approved building permit46
16.01.2017No building permit as long as the land is not developed?10
05.06.2017Potential neighbor threatens with difficulties13
05.10.2017Property / Development Plan / Retaining Walls / Excavations17
22.01.2018Building on still foreign land - Waiting for building permit25
15.08.2018Basic floor area ratio / floor area ratio for plots without a development plan: How to calculate? Experiences?18
29.08.2018Filling up a raised plot of land to make it level - building permit required?16
18.09.2018Immission protection concerns self-service gas station - building permit?20
24.10.2018Broker sells house without current building permit. Notary costs?25
22.11.2019Living in the garden house in summer11
29.09.2020Building permit before completion of development31
30.01.2022Plot 4500 m² (nursery) - preparation of development plan independently16
29.06.2023Position of garage on property, specification in development plan22
23.08.2023Price evaluation of plot for end terraced house19
03.08.2024Nice plot of land, but is the development plan too restrictive?21
09.09.2024Building on family-owned property - green space with ground monument37

Oben