5 dry units for 5 weeks. Non stop. That's how it was with us :)
 

Prager91

2022-02-08 13:49:35
  • #2


The underfloor heating is properly pushed up to 45 degrees using the screed program. It should then run completely for 3-4 weeks. Additionally, 2 more dehumidifiers will be used. After that, according to the heating installer/general contractor, the screed should be dry enough to be tiled.
 

WilderSueden

2022-02-08 14:04:16
  • #3
Do you have such a big house or why five of them at once? And with or without fans?
 

allstar83

2022-02-08 14:29:19
  • #4

Back then it was with fans and water hoses running directly outside. The house is also quite large.
It was a very unfortunate time recently with extremely high humidity outside. Ventilating with the windows was not possible. Furthermore, the house was left open in winter. It was a battle with snow and water...
Better like this than at a colleague’s place. There they had to replace the floor...
 

Tolentino

2022-02-08 23:51:20
  • #5

45 degrees for three weeks?
I wouldn't accept that.
 

Prager91

2022-02-09 07:40:27
  • #6
No. Screed program runs starting at 15 degrees up to 45 degrees and then back down to 15 degrees - that takes three weeks. Maximum 2 days at one temperature level.
 