Technical room boundary construction, air source heat pump suction

  • Erstellt am 2017-08-28 15:22:14

TK1804

2017-08-28 15:22:14
  • #1
Hello everyone,
we are currently in the house construction planning phase. The floor plan is set. Now we are planning the heating system. The question has arisen whether we should design the exhaust/blower of the air heat pump towards the neighbor. Please note, the technical room is on the border with the neighbor. Does anyone know if this is allowed?
Alternative: Are there also air heat pumps where the exhaust and blower do not operate around a corner, but are positioned one above the other in the same direction?
Thanks and regards
 

Uwe82

2017-08-28 15:27:34
  • #2
Directly at the border? Don’t you have to keep a distance of 3m from the neighboring property?

It is a matter of noise pollution, but the local situation must be examined.

But regarding the last question, heat pump not around the corner: That should not be allowed, as you risk a thermal short circuit, i.e., the intake sucks in the blown-out air again.
 

kaho674

2017-08-28 15:27:40
  • #3
Just asking as a side question: would you like it if the neighbor aimed his blower into your garden?
 

TK1804

2017-08-28 15:29:56
  • #4
Hello Kaho674,

this is initially about the question of whether it is even allowed.
 

halmi

2017-08-28 15:48:05
  • #5
You certainly aren't allowed to build your technical room directly on the boundary, are you?
 

Marvinius II

2017-08-28 15:53:38
  • #6
Technical room disguised as a garage? [emoji6]
 

Similar topics
08.04.2015Install a technical room in the garage? Is this possible?35
15.08.2016Technical room as small as possible - under the stairs?10
28.02.2016Kitchen extraction is no longer working14
19.08.2017Technical room before installing screed: should the technology be painted now or later?16
18.09.2017Underfloor heating also in the technical room / utility room19
12.08.2019Optimal size and position of the technical room11
01.01.2020Technical room next to the bedroom23
27.09.2020Sound insulation of geothermal heat pump in the technical room17
14.12.2022House connection planning and technical room in the basement11
07.05.2024Door contact cable laid into the technical room21

Oben