Switch from KFW153 to BEG WG 55 EE

  • Erstellt am 2021-06-16 21:15:13

HappyEnd

2021-06-16 21:15:13
  • #1
Good evening,

We want to start our new construction project with a general contractor in September. After some delays, September has been confirmed as the start of construction.
We had our coordination meeting this week (fixed price commitment + floor plans are available) and want to sign the construction contract with our general contractor.

We have already signed the loan agreement with our bank to secure the favorable interest rate at that time.
Part of the financing is the KFW153 loan of €120,000 for a KFW55 new building.

Now, of course, it would be interesting for us to switch to the new funding BEG WG 55 EE.

Whether the bank will cooperate remains to be seen; does the six-month blocking period apply to our specific case? Or is there another KO criterion?

The six-month waiting period for reapplication only applies within the BEG. Accordingly, it is possible without a blocking period to withdraw a MAP application or EBS application and resubmit it for the BEG. Of course, it still applies that applications for the BEG must be submitted before the start of the project (=contract signing).
 

Similar topics
11.06.2013Radiator in the new building?13
13.10.2020Renovate a used house or build a new one13
12.10.2013New construction on communal property, tax issue16
22.11.2013Costs of inheritance, demolition, new construction15
06.02.2017Insulate new construction 36.5 aerated concrete?60
05.08.2014New single-family house (KFW70)/aerated concrete vs. sand-lime brick/what to use?71
07.04.2014Is new construction possible without solar and without a heat pump?20
16.05.2014What makes a new building expensive?20
15.06.2015New construction: Plaster the concrete ceiling on the ground floor18
18.01.2015New construction Kfw70 underfloor heating and tiles11
08.01.2015How is the amount of the land charge determined in the case of a new construction?14
16.03.2015Is financing new construction realistic?12
06.01.2017Quiet decentralized ventilation for new single-family house73
16.04.2015New construction or buy house, built in '9132
08.05.2015Renovate an old building from 1957 or buy a new building?13
30.09.2018BAFA funding for air-water heat pumps in new construction - how does it work?30
09.09.2021Federal funding for efficient buildings (BEG) from Q1 2021240
14.02.2024Bafa funding for heat pumps will be discontinued as of 31.12.2020.510
14.06.2022KfW BEG funding stopped 261, 262, 263, 264, 461, 463, 4641239
03.12.2024Wibank Hessen Loan Application Documents and Experiences55

Oben