Hello everyone,

to plan the further construction of a prefab house and its costs, I have now inquired about which documents the company would need.

According to the information, they are ...
- site plan (available)
- development plan (available)
- survey plan

I already have the site plan and the development plan.
Now I am wondering what is included in a survey plan?
Because the plot is located in a new development area which has already been surveyed and the boundary stones are also in place.

That means I shouldn’t have to budget any more costs for a survey of the plot, right?
Because all the data should already be recorded.

If yes, where can I get such a plan?

Thanks to you!
 

Wastl

2013-08-31 13:53:03
  • #2
From a surveyor. You first need a survey with rough measurements and then a string framework for the actual construction of the building to set up the foundation slab / basement. The manufacturer must be given the exact location and height. Your boundary stones only mark the property, not the position of your house. These services, including the creation of the survey plan for the registration of the construction project at the district office, had to be provided by us for our prefab house.
 

PhoenixDH

2013-08-31 13:57:45
  • #3
That means I have to order a surveyor to measure the property precisely again. I then give this plan to the prefabricated house manufacturer so that they can measure the foundation slab accordingly?
 

Jaydee

2013-08-31 15:32:34
  • #4
I'm a little surprised why the company needs the surveying plan already. I assume that the layout and size of the house are not finalized yet. Therefore, the surveyor can't really measure accurately yet.

Our surveyor was just there NOW, namely right before the construction of the foundation slab.

Ask the guys from the prefab house company again what exactly they want right now.
 

Wastl

2013-09-01 09:35:30
  • #5


I completely agree. Ask again! In our case, the basement was outsourced. We had to provide and commission a surveyor for the basement builder. However, both coordinated their schedules, as the fine survey and rough staking take place immediately before or during the construction phase.
 

PhoenixDH

2013-09-01 12:10:24
  • #6
I will do that. Of course, it could also be that I misunderstood that.
Costs are about €2500, right?
 

Similar topics
10.12.2012Terrain elevations in the development plan are incorrect.12
04.03.2015Budget plot and building with basement21
05.10.2017Property / Development Plan / Retaining Walls / Excavations17
14.03.2018Slight slope, building with a basement or a floor slab?16
15.08.2018Basic floor area ratio / floor area ratio for plots without a development plan: How to calculate? Experiences?18
30.09.2019200m2 single-family house for 4-5 people without a basement on a narrow plot67
30.09.2019Floor plan optimization of a single-family house with a basement on a small plot178
27.06.2020Level the basement or the plot?43
27.01.2020Building a single-family house with/without a basement on a small plot65
28.07.2020Single-family house 160m2 with basement, 500m2 plot108
09.10.2020Single-family house 220 sqm with basement on 700 sqm plot41
11.01.2021Basement or slab? - Cost estimation24
19.10.2020Street about 50cm above the property - backfill or basement24
28.11.2020Expensive plot + single-family house 155 sqm + cellar KFW40+, financeable?60
30.01.2022Plot 4500 m² (nursery) - preparation of development plan independently16
04.03.2022Property development - basement yes or no?75
29.06.2023Position of garage on property, specification in development plan22
30.08.2023Preparing the site for the floor slab on a slight slope15
09.09.2024Floor plan design: Single-family house with basement; 560 sqm plot65
18.04.2024Floor plan design: Single-family house; with basement; 800 sqm plot10

Oben