We are building a terraced mid-terrace house from a developer. Throughout the entire house (basement, ground floor, upper floor, and attic), a floating screed consisting of thermal insulation, separation layer, and cement screed will be installed. Construction will start shortly, and after handover, the flooring work will be done by ourselves. We also want to lay click vinyl on the screed.
In the purchase contract / construction description, it states that “leveling the screed with appropriate leveling material and filler is not part of the flooring work. The standard specified installation height of approx. 10mm must be observed.”
What does this specifically mean in the end for the following future scenario? If I ultimately have, for example, a 2 cm difference between or within the individual rooms, do I have to accept that? Is this not taken into account during the screed work?
Regardless, we want a building surveyor to accompany the new construction. Could he also exert more pressure with regard to defect remediation? We would like to avoid the leveling work on the screed...