You say that so easily, but normally you are not allowed to enter the construction site. In addition, now only the sockets and switches are installed, so that it really stands out.
 

Zaba12

2019-06-12 15:29:54
  • #2

How not enter? So it’s not a general contractor but a property developer?

EDIT:
If it’s a property developer, you actually have no say on the construction site and can go through/record and report everything you consider a defect with an expert at the acceptance.

Whether you get a discount for it is another matter.
 

lasa64

2019-06-12 15:30:32
  • #3

Exactly
 

Lumpi_LE

2019-06-12 15:31:18
  • #4
Looks to me like plastered Poroton, it doesn't really get much more elaborate than that.
 

hampshire

2019-06-12 19:36:01
  • #5
I'm really sorry about that. This is an aesthetic defect, not a functional one. You will probably have to accept it unless it was discussed or described differently. You can point it out again during the handover.
 

apokolok

2019-06-14 13:39:57
  • #6
Say now that you will not accept it like that and it has to be changed. The effort is not that big with 5 boxes now if they did not cut the cable to the mm. With a chisel and some plaster, it is done in a few hours. Well, the plaster still needs to be repaired.
 

Similar topics
02.02.2009Building materials are stolen at the construction site12
06.02.2013Developer says: No more insulation!12
23.03.2011Developer or architect?15
26.09.2011Finding tiles from other manufacturers / sample selection for builders13
09.07.2012Developer offer for single-family house - Are the construction costs acceptable?16
16.07.2012The builder "outsources" fixed-price services to subcontractors12
03.08.2012Contract Supplement to the Construction Contract by the Developer36
30.09.2012Developer - Is withdrawal from the purchase contract possible?11
01.12.2014Real estate transfer tax / what is the tax applied to? Which developer MUST?30
18.02.2014Massive problems with the builder - is contract termination possible?33
23.06.2014Developer charges heavily for replanning - justified?12
30.08.2019Is it sensible to have a building surveyor for condominiums from the developer?11
11.10.2018Waste on the construction site - What is tolerable?138
15.09.2019Developer refuses to hand over documents32
09.02.2020Developer | Special Request | Cost Assumption38
23.03.2020Curfew: Am I still allowed to go to the construction site in Bavaria?73
09.04.2020Visit the construction site for ventilation?17
16.08.2020Bathtub misaligned - defect?15
19.08.2021House building - an eternal construction site?33
21.09.2022Camera / mobile phone for documentation in the workshop or construction site13

Oben