Screed vs. Fast-drying Screed

  • Erstellt am 2022-10-20 08:39:02

Bauenaberwie

2022-10-20 14:36:53
  • #1
Ok thanks for the info. How is it actually with the electricity? We will soon get the meter and do I now have to take out a new electricity tariff? Can I double my current one and also use it for the house? My current contract is at 32 ct and a new contract is at 80 ct. That already makes a considerable difference when heating the screed :(
 

WilderSueden

2022-10-20 14:45:58
  • #2
Can you do the house connection later and use the construction power until then?
 

SaniererNRW123

2022-10-20 14:47:02
  • #3
That probably makes sense. So far you have a construction power contract? You have to ask your supplier - but I don't think so. Contracts are usually linked to consumption points. Where are there such expensive contracts in Germany? With 40 cents something should be possible.
 

Tolentino

2022-10-20 14:56:37
  • #4
You can now move regarding your provider, then you will get your current contract in the house (provided that they basically supply electricity at the construction site) and at your place of residence, you will fall into the basic supply. That could be cheaper than an applied new contract
 

Bauenaberwie

2022-10-21 06:19:06
  • #5
Thank you all. The construction power is supplied by the builder and the contract stipulates that the heating of the screed is then the responsibility of the client. I will call our supplier and ask what options are available.
 

WilderSueden

2022-10-21 08:05:22
  • #6
With me, the general contractor also takes over the construction power except for the screed, but we only do the utility connections afterwards. We then charge for the screed power. Talk to your general contractor.
 

Similar topics
16.06.2011Conclude a construction contract under reservation?10
13.09.2012Feeling pressured into a contract, is that normal?17
29.09.2011Is construction pre-planning without signature / contract legally valid?12
06.12.2017Until when must construction power be taken?22
22.09.2012Who else fell for a contract with a reservation clause? - Search13
23.06.2015Secondary construction costs, amount of construction electricity/construction water, how much?18
16.05.2015Contract unclear: humus earth collectors10
23.08.2015Construction financing with a fixed-term contract13
29.04.2016Organize construction electricity/construction water yourself?31
19.10.2017Temporary power supply - What costs are involved?19
05.07.2018Temporary electricity stolen - amount of compensation?17
20.07.2018Construction power or house connection? How much construction power is needed?12
19.03.2019Construction power is being connected. Does the builder have to be present?10
20.05.2019Temporary power also through alternative suppliers?10
04.10.2019Easily switch temporary power provider?21
11.05.2020Construction power help, who can give tips?17
10.01.2022Determine construction power costs / eOn charges too much36
18.11.2022Heating not available - Who bears the costs?77
23.10.2023Judgment on construction power supply - assessments / experiences?10
09.10.2024Construction electricity/construction water costs are the responsibility of the builder11

Oben