Joschka80
2018-05-20 01:11:53
- #1
Hello everyone,
after much back and forth, we have abandoned the idea of a new build and will renovate and convert a single-family house (fully brick-clad) with a basement apartment (built in 1982).
Specifically, we are planning the following:
Basement extension in front of the house
Addition of a floor in the upper floor including a new ceiling for two additional children's rooms
Demolition of some interior walls to enlarge the kitchen
Partial demolition of the roof structure
Partial demolition of a typical, monstrous 80s chimney. It will then be used in a slimmed-down form
New heating system
Replacement of all windows and doors
Energy refurbishment of the entire roof
Renewal of all floor coverings and interior plaster throughout the house
Enlargement of an existing bathroom on the upper floor
Renewal and extension of the entire electrical installation
New underfloor heating throughout the upper floor (underfloor heating on the ground floor will remain)
New pathways and new paving of garage driveway and parking space
The entire upper floor (existing and addition) as well as the extension are to receive a ventilated facade with Trespa
Attached you will find floor plans and elevations.
What is your opinion on the changes planned so far? What works, what doesn’t?
We look forward to all comments, suggestions, ideas, and improvements. Thanks in advance!
Have a nice Pentecost weekend
Joschka



after much back and forth, we have abandoned the idea of a new build and will renovate and convert a single-family house (fully brick-clad) with a basement apartment (built in 1982).
Specifically, we are planning the following:
Basement extension in front of the house
Addition of a floor in the upper floor including a new ceiling for two additional children's rooms
Demolition of some interior walls to enlarge the kitchen
Partial demolition of the roof structure
Partial demolition of a typical, monstrous 80s chimney. It will then be used in a slimmed-down form
New heating system
Replacement of all windows and doors
Energy refurbishment of the entire roof
Renewal of all floor coverings and interior plaster throughout the house
Enlargement of an existing bathroom on the upper floor
Renewal and extension of the entire electrical installation
New underfloor heating throughout the upper floor (underfloor heating on the ground floor will remain)
New pathways and new paving of garage driveway and parking space
The entire upper floor (existing and addition) as well as the extension are to receive a ventilated facade with Trespa
Attached you will find floor plans and elevations.
What is your opinion on the changes planned so far? What works, what doesn’t?
We look forward to all comments, suggestions, ideas, and improvements. Thanks in advance!
Have a nice Pentecost weekend
Joschka