my wife and I have just applied for a construction loan and have now received the approval *yippee*. Unfortunately, our bank finds the financing list (additional building costs, AA) quite high. My question is now, is it allowed to list a buffer of about 11k as a position? Or is that not very well regarded? Especially with the laying + excavation of the trench + closing of the water pipe / civil engineering, we are very uncertain and have calculated accordingly 'a lot'. I have now adjusted our financing plan, but I am still very unsure. Moreover, during construction, changes and possibly adjustments inevitably occur.
Construction costs are probably okay
283,465 €
Additional building costs
Drinking water connection 2,500 €
Rainwater connection 3,000 €
Wastewater connection 3,000 €
Electricity connection 2,500 €
Telephone connection 800 €
Soil investigation (for disposal) 600 €
Disposal and removal 2,000 €
Building surveying 650 €
Connection of construction electricity, water, heating 500 €
Buffer 8,824.53 €
Outdoor facilities
Garden own work 500 €
Driveway / parking space own work 4,000 €
Driveway material 4,000 €
Greening material 2,040 €
Fencing 1,800 €
Buffer 2,000 €
* own work
The construction itself is carried out with a developer in Bavaria, but without the installation of water, electricity, and telephone. A single (i.e., combined shaft) is needed on our property.
We would be very happy about a short assessment
my wife and I have just applied for a construction loan and have now received the approval *yippee*. Unfortunately, our bank finds the financing list (additional building costs, AA) quite high. My question is now, is it allowed to list a buffer of about 11k as a position? Or is that not very well regarded? Especially with the laying + excavation of the trench + closing of the water pipe / civil engineering, we are very uncertain and have calculated accordingly 'a lot'. I have now adjusted our financing plan, but I am still very unsure. Moreover, during construction, changes and possibly adjustments inevitably occur.
Construction costs are probably okay
283,465 €
Additional building costs
Drinking water connection 2,500 €
Rainwater connection 3,000 €
Wastewater connection 3,000 €
Electricity connection 2,500 €
Telephone connection 800 €
Soil investigation (for disposal) 600 €
Disposal and removal 2,000 €
Building surveying 650 €
Connection of construction electricity, water, heating 500 €
Buffer 8,824.53 €
Outdoor facilities
Garden own work 500 €
Driveway / parking space own work 4,000 €
Driveway material 4,000 €
Greening material 2,040 €
Fencing 1,800 €
Buffer 2,000 €
* own work
The construction itself is carried out with a developer in Bavaria, but without the installation of water, electricity, and telephone. A single (i.e., combined shaft) is needed on our property.
We would be very happy about a short assessment