M4rvin
2020-02-16 10:33:56
- #1
Hi guys! Since it's slowly getting warmer, some outdoor work will probably be coming up soon! Before I start working wildly on it, I would like to hear a few opinions from you first. The following needs to be done: 1) Set curb stones 2) Spread and compact mineral concrete 3) Pave terrace and parking spaces 4) Build retaining wall 5) Garden shed Priority is first to pave the surfaces to keep all the dirt away from the house. For that, I should first set the curb stones and then fill up with mineral concrete. Can you leave the mineral concrete as is after compacting, or do you have to immediately level it with grit and pave? (We have already roughly backfilled and compacted during the earthworks; it's now quite bumpy.) Should the drainage channels be set beforehand and compacted around them? At the parking space by the street, we should definitely install one; how about on the terrace? By the house or by the wall or both? I have a wastewater connection at the heat pump, but that would require quite a lot of digging and laying in a curve right now. Would it also be an option to simply connect to the existing house connections? (Basically just cut out a piece and install a Y-piece.) Thanks in advance for your impressions Marvin
