Hello,
our planned single-family house needs to be plastered and painted on the inside - for this, the walls are first plastered/sanded, then a fiberglass fleece is applied, and then it is painted (correct me if I'm wrong). I had now calculated about 680 sqm of wall and ceiling area (160 sqm living space). Now I receive an offer of 2900 EUR; material and labor included. That can’t be right, can it?!

Best regards
Nilorac
 

Nilorac

2013-05-29 15:03:00
  • #2
Have read that painting costs 5 EUR per sqm...? So do you find that realistic?
 

ypg

2013-05-29 16:21:14
  • #3
And what have you read about spackling? That is very time-consuming!
 

Der Da

2013-05-29 16:45:46
  • #4
I hope you don't find this price too high. In my eyes, this price is far too low, which would make me suspicious. To putty and sand around 600 sqm, two craftsmen worked for 5 days with us. Painting and wallpapering the entire area would have taken another 5 days. That would be 160 working hours. That means at your price €18.50 per hour. For that, you get a black-market worker, but no reputable company. And if the material is supposed to be included as well... never ever. We had an offer: approximately €6000 for wallpapering and painting the entire area. (Also 600 sqm). Doing it ourselves with two weeks of work, we managed it for €1000.
 

blockhauspower

2013-05-29 17:22:07
  • #5
With my question "why not" I wanted to express exactly the concerns of my predecessors. If it is a reputable painting company, they also use brand-name products and not 12€ paint from AxxI. Of course, that costs more. In addition, there are the labor hours, machine hours, travel, etc. Anyone who has ever filled, sanded, filled again, sanded again, and then painted several hundred square meters of walls and ceilings knows how much work that is. I think a backing fleece is planned. Why is that? It is actually unnecessary with well-filled gypsum plasterboards.

I would recommend checking the offer, possibly obtaining a second one, and if everything is in order for the price: congratulations on this favorable offer.
 

Similar topics
28.09.2010Can the surface be re-taped?11
20.02.2014damp walls at terrace doors and front door11
19.11.2013Walls made of Styrodur or Styrofoam?10
27.03.2014What must be considered when removing or relocating walls?10
12.06.2014Walls of a new single-family house, ground floor runs crooked, defect correction construction defect19
28.06.2015Tile walls before floors?11
04.01.2017Plaster walls in new construction or use fleece?16
02.08.2017Costs for interior finishing: flooring, walls, ceilings24
06.04.2018Floor plan change - Load-bearing walls in the apartment. What to do?14
18.07.2018Garage construction made of concrete! 3 walls or house extension? What do you think?26
18.05.2020First move in - then plaster, paint, and install flooring12
29.07.2019Replaster/re-clad walls (with photos)12
27.11.2020Myth?! "Breathing Walls" What is the truth?54
21.08.2021Walls painter fleece / ceiling lime paint?22
19.04.2017Electroosmosis to renovate damp walls11
10.09.2021Plaster Q2 walls with roll plaster or other recommendation?27
17.05.2022Decorative tiles - 3D tiles - show off your special walls34
06.04.2023Tile patterns on bathroom walls26
12.01.2025Comprehension question: Gable roof - load-bearing walls - floor plan11

Oben