darksun
2023-06-02 09:24:10
- #1
Hello, we are building a prefabricated house with a basement (concrete), on the basement floor (floor slab) the sealing membrane ("Alujet Floorjet") has already been laid and pulled up a bit on the walls and glued there. The electrician then laid underground cables (electric cables) on the floor and fixed the cables to the floor with cable clips and nails. Is that OK? In these spots, the sealing membrane is basically somewhat "leaky," moisture can wick through the barrier via the nails ...