Hello,
we have integrated a small workshop into the garage. The room is insulated but has no heating. It is slowly drying out on its own. We are constantly ventilating. Of course, it takes forever without heat. This week, Lidl had moisture meters. It gives me values in %, whatever that is supposed to mean. The screed is now between 3% and 6%. Does anyone have an idea what the values are supposed to tell me? From when can I start thinking about tiling?
Should the room maybe be heated up? I was thinking about 1 week at 20°C. Would that be enough? What do you think?
we have integrated a small workshop into the garage. The room is insulated but has no heating. It is slowly drying out on its own. We are constantly ventilating. Of course, it takes forever without heat. This week, Lidl had moisture meters. It gives me values in %, whatever that is supposed to mean. The screed is now between 3% and 6%. Does anyone have an idea what the values are supposed to tell me? From when can I start thinking about tiling?
Should the room maybe be heated up? I was thinking about 1 week at 20°C. Would that be enough? What do you think?