Main connection box installed before interior plaster in the utility room

  • Erstellt am 2020-07-30 22:51:50

Mudo1991

2020-10-18 12:14:46
  • #1


Can you tell me what the box in your picture is called from which the 4 connections come out?
 

Mycraft

2020-10-18 13:12:18
  • #2
This is a Hauff multi-branch house entry.
 

DerGuteTon

2020-10-18 16:08:35
  • #3
Correct. I can't complain about that either. Here in the new development area, they all voted if they voted for more than one category.
 

Knöpfchen

2020-10-18 16:57:33
  • #4
If the area behind the house connection box cannot be properly plastered, airtightness is no longer guaranteed. That would be like a hole in the [Dampfbremsfolie].
 

danixf

2020-10-18 16:59:29
  • #5
Judging by the photo, that is not an exterior wall and therefore does not matter
 

Knöpfchen

2020-10-18 19:35:18
  • #6
Sit normally but house connections to the exterior wall.
 

Similar topics
07.03.2011Outer wall, interior insulation, and then slate in the new building16
15.10.2012Continuous horizontal crack in the exterior wall.11
20.09.2013Exterior wall brick + interior walls lime sandstone10
11.10.2017Strength of the exterior wall12
05.09.2016Move exterior wall in floor plan?33
07.05.2020U-value outer wall 0.26 - is that okay?13
02.07.2019Purlin distance from exterior wall or roof16
17.10.2020Cabinet in front of insulated exterior wall - risk of mold?10
24.03.2021Cracks detected in basement concrete exterior wall, how to proceed?33
26.02.2021(Rising?) Moisture Base / Exterior Wall11
09.10.2022How to seal cable installation on an exterior wall?12
14.03.2024Installation level including insulation - influence on the insulation of the exterior wall?12
05.05.2024Is the exterior wall of an existing property correctly executed?18

Oben